What work should be done before commissioning the softened water equipment?
For the installation of softened water, the preliminary preparation work is very important, because it will directly affect the future operation and service life of the equipment, this article is about the preparation work before the installation and commissioning of softened water equipment.
The preparations for the installation and commissioning of the water softening equipment are as follows:
The first step: close the inlet valve, open the bypass valve, wash the impurities in the pipeline that will lead to the blockage of the pipeline, and close the bypass valve.
Step 2: Confirm that the electrical parameters of the equipment and the power supply are consistent, and then switch on the power supply. Manually start the regeneration controller, adjust it to the backwash state, and open the inlet valve to 1/4, which will hear the sound of air discharge, and completely open the inlet valve after the air is completely discharged. Then rinse the impurities in the value until clear water is discharged from the drainage pipe.
Step 3: Adjust the control valve in the washing position until the water quality of the effluent reaches the qualified standard.
Step 4: The control valve is adjusted to the water injection position of the salt tank, the salt tank is injected with the designed water consumption, and the solid salt particles are added to the operation and debugging.
The above is the introduction of the work to be done before the commissioning of the softened water equipment. Because the reasonable debugging of the equipment is related to the stable operation of the equipment, the softened water equipment should be strictly treated in the early preparation work to ensure the smooth completion of the installation and debugging of the equipment.