3 tons double stage defluorination water purification equipment

Oct 27, 20265 min readVOLARDDA Engineering Team2 views

Customer Situation

Country:Kenya

Raw Water: Groundwater

Introduction: The customer of Kenya Railway project for ordering 3 tons of dual-stage defluorination and water purification equipment.His raw water is groundwater and used by the factory. Thanks for his ordering.

Project Introduction

The client for this cooperation is from the railway project in Kenya, who mainly valued the advantages of Volardda in the manufacturing and service of desalination equipment. The equipment adopts an optimized design after technology upgrades.The stability and operational practicability of the whole machine are greatly improved, with high quality and high cost performance.

The main parameters of this system

Capacity:3T/H

Size: Customized

Voltage: 220 (V) (can be customized according to different national standards)

Brand:Volardda

Project Site

Need Help Choosing the Right System?

Send your water analysis, required capacity and site location — our engineers will reply with a tailored solution within 24 hours.

Thanks! Your inquiry has been received.

Ready to Start Your Water Treatment Project?

Tell us your water source, capacity and application — our engineers will design the most cost-effective system for you.